+39 011-9571597
Mon-Fri 9:00 – 18:00 / Closed on Weekends
Contact Us

Big Science

The Great Challenges of the 2000s tackled by the Most Important Research Centers

Over 15 years ago, Delta-ti entered the world of “big science” and has since served these major research centers. We offer our expertise and professionalism, backed by decades of experience. Many major projects bear our signature, our certification, and our commitment to the reliability of the systems and the quality of the final product.

Delta-ti realizes:

ITER

Delta-ti, in temporary joint venture with Fincantieri and Comes, is currently carrying out the TCC1 contract (Tokamak Contract Complex), which involves all the essential auxiliary activities required for the operation of the world’s largest thermonuclear fusion reactor, currently under construction in the south of France. The project includes the prefabrication and installation of piping and components, adhering to the strict standards required for a nuclear installation.

FUSION FOR ENERGY (F4E)
Design and construction of cooling systems for the SPIDER and MITICA experiments at the PRIMA site in Padua.
CERN
• Design and construction of a new perfluorohexane distribution network at -72°C – ATLAS ID THERMOSYPHON PROJECT – LHC Point 1.
• Design and execution of hydraulic and air systems for the ISOLDE building.
• Supply and installation of two pumping stations serving Building 180.
• Design, supply, installation, and commissioning of the cooling system for the NA62 GIGATRACKER.
ALENIA AERMACCHI
Design and construction of all experimental systems for the new HIRF-EW building for aircraft testing, which includes two facilities: ASC (Anechoic Shielded Chamber) and SLS (Sky Light Simulator).

Specifically, we have worked with:

ITER

View case
F4E
View case
CERN
ALENIA AERMACCHI

Big Science

The Great Challenges of the 2000s tackled by the Most Important Research Centers

Over 15 years ago, Delta-ti entered the world of “big science” and has since served these major research centers. We offer our expertise and professionalism, backed by decades of experience. Many major projects bear our signature, our certification, and our commitment to the reliability of the systems and the quality of the final product.

Delta-ti realizes:

ITER

Delta-ti, in temporary joint venture with Fincantieri and Comes, is currently carrying out the TCC1 contract (Tokamak Contract Complex), which involves all the essential auxiliary activities required for the operation of the world’s largest thermonuclear fusion reactor, currently under construction in the south of France. The project includes the prefabrication and installation of piping and components, adhering to the strict standards required for a nuclear installation.

FUSION FOR ENERGY (F4E)
Design and construction of cooling systems for the SPIDER and MITICA experiments at the PRIMA site in Padua.
CERN
• Design and construction of a new perfluorohexane distribution network at -72°C – ATLAS ID THERMOSYPHON PROJECT – LHC Point 1.
• Design and execution of hydraulic and air systems for the ISOLDE building.
• Supply and installation of two pumping stations serving Building 180.
• Design, supply, installation, and commissioning of the cooling system for the NA62 GIGATRACKER.
ALENIA AERMACCHI
Design and construction of all experimental systems for the new HIRF-EW building for aircraft testing, which includes two facilities: ASC (Anechoic Shielded Chamber) and SLS (Sky Light Simulator).

Specifically, we have worked with:

ITER

View case
F4E
View case
CERN
View case
ALENIA AERMACCHI