Civil, mechanical, and electrical design, procurement, construction, and commissioning of the BOP engines for the new EDIOSON trigeneration plant at the Michelin facility in Cuneo. The project includes the design and construction of the building, as well as all mechanical and electrical power and control lines. The plant consists of two 12 MW electric engines, two 5-ton/h waste heat recovery steam generators (WHRSG) producing steam at 22 barg, and all auxiliary systems, including oil systems, urea with SCR, high and low-temperature thermal fluid recovery circuits, and steam production.