EPC for the construction of a Polo Freddo serving the environmental air conditioning system of the FIAT POWERTRAIN plant in Termoli (CB). The project involves civil, mechanical, and electrical design, followed by construction, commissioning, and operation. Polo Freddo ensures the production of chilled water necessary for the cooling of the three workshops, Termoli 1, Termoli 2, and Termoli 3, at the Fiat Powertrain Technologies plant, with a total cooling capacity of around 20 MW. The plant, including civil works, was built from scratch in approximately six months.